Used 2025 BMW M5 Base

Stock: TSCU68246VIN: WBS83GV05SCU68246

Stock: TSCU68246 VIN: WBS83GV05SCU68246

Used 2025 BMW M5 Base

Detailed Pricing
Market Value:
$159,588
Benton Savings:
- $26,598
Internet Price:
$132,990
Finance Incentive
- $1,500
Dealer Doc Fee:
+ $999
Final Price:
$132,489

Overview
TSCU68246
Stock
WBS83GV05SCU68246
VIN
8,895
Miles
Crossover
Body
AWD
Drivetrain
Frozen Deep Grey Metallic
Exterior
Black
Interior
118.3
Wheelbase
4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30
Engine
Gas
Fuel
8-Speed Automatic Sport
Transmission
4
Doors
Description
Custom Built 2025 BMW M5 Touring! $40k in Upgrades! Fully customized and performance-enhanced, this 2025 M5 Touring blends luxury with aggressive power. Twin-turbo V8 with upgraded air intakes and tuning for increased performance and responsiveness. Features include: JB4 Tuned Downpipe Intake Upgrade Lowered 22 staggered Vossen wheels on Michelin tires Full PPF (paint protection film) Carbon fiber package Ceramic window tint Enhanced exhaust note ***Here at Benton Nissan of Columbia, our goal is truly exceptional customer service. This goes through all aspects of the sales process on your new vehicle. We offer Benton Benefits Package available on every qualified vehicle. Our Benton Benefits is our exclusive package that includes Window Tint with Lifetime Warranty, Lifetime Exterior Car Wash (BNC DEALER ONLY) 2 Synthetic Oil Changes & Tire Rotations, Benton All Weather Package, NO Vehicle Diagnostic Fees. $889.99 for all qualifying vehicles. Ask your sales Consultant for details.
Features
Apple CarPlay

Apple CarPlay

Brake Assist

Brake Assist

Ventilated Seats

Ventilated Seats

Hands-Free Liftgate

Hands-Free Liftgate

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Liftgate

Power Liftgate

Power Seat

Power Seat

Power Windows

Power Windows

Rain Sensing Wipers

Rain Sensing Wipers

Rear Air Conditioning

Rear Air Conditioning

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

Heads-Up Display

Heads-Up Display

Heated Steering Wheel

Heated Steering Wheel

Details
Features
Navigation System
Connected Package Pro
Driving Assistance Professional Package
Executive Package
M Driver's Package
18 Speakers
AM/FM radio: SiriusXM
Bowers & Wilkins Surround Sound
Radio data system
Radio: AM/FM Audio System
SiriusXM Satellite Radio w/1 Year Subscription
Air Conditioning
Automatic temperature control
Front dual zone A/C
Rear air conditioning
Rear dual zone A/C
Rear window defroster
Heads-Up Display
Memory seat
Power driver seat
Power steering
Power windows
Remote keyless entry
Steering wheel memory
Steering wheel mounted audio controls
Adaptive suspension
Four wheel independent suspension
Speed-sensing steering
Traction control
4-Wheel Disc Brakes
ABS brakes
Dual front impact airbags
Dual front side impact airbags
Emergency communication system: BMW Assist eCall
Front anti-roll bar
Low tire pressure warning
M Carbon Ceramic Brakes
Occupant sensing airbag
Overhead airbag
Rear anti-roll bar
Power Liftgate
Brake assist
Electronic Stability Control
Exterior Parking Camera Rear
Auto High-beam Headlights
Delay-off headlights
Fully automatic headlights
Panic alarm
Security system
Speed control
Auto-dimming door mirrors
BMW Iconic Glow Kidney Grille
Bumpers: body-color
Heated door mirrors
Power door mirrors
Spoiler
Turn signal indicator mirrors
Active Driving Assistant Pro
Apple CarPlay & Android Auto Compatibility
Auto tilt-away steering wheel
Auto-dimming Rear-View mirror
BMW Assist eCall
BMW Curved Display w/HUD
BMW TeleServices
Carbon Fiber Silver Thread High Gloss Trim
ConnectedDrive Services
Driver door bin
Driver vanity mirror
Front reading lights
Garage door transmitter
Heated steering wheel
Illuminated entry
Interior Camera
Leather steering wheel
M Drive Professional
M Multi-Function Seats
Outside temperature display
Parking Assistant Plus
Passenger vanity mirror
Personal eSIM 5G
Rear reading lights
Rear seat center armrest
Sport steering wheel
Tachometer
Telescoping steering wheel
Tilt steering wheel
Trip computer
Wireless Device Charging
Extended Merino Leather Upholstery
Front & Rear Heated Seats
Front Bucket Seats
Front Center Armrest
Front Ventilated Seats
Heated Front Seats
Heated front seats
Power Front Seats
Power passenger seat
Split folding rear seat
Passenger door bin
Alloy wheels
Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual Spoke
Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke
Rear Manual Side Window Shades
Rain sensing wipers
Speed-Sensitive Wipers
Variably intermittent wipers
Mechanical
Engine: 4.4L TwinPower Turbo V8
Engine Auto Stop-Start Feature
Electronic Transfer Case
Part And Full-Time All-Wheel
3.31 Axle Ratio
Engine Oil Cooler
Battery w/Run Down Protection
Hybrid Electric Motor
Gas-Pressurized Shock Absorbers
Front And Rear Anti-Roll Bars
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Electric Power-Assist Speed-Sensing Steering
15.9 Gal. Fuel Tank
Quasi-Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Double Wishbone Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
Regenerative 4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Electro-Mechanical Limited Slip Differential
Lithium Ion (li-Ion) Traction Battery w/7.4 kW Onboard Charger and 4 Hrs Charge Time @ 220/240V
Exterior
Tire Mobility Kit
Fixed Glass Sky Lounge Panoramic 1st And 2nd Row Sunroof w/Power Sunshade
Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Black Side Windows Trim
Body-Colored Door Handles
Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Fixed Rear Window w/Defroster
Light Tinted Glass
Speed Sensitive Rain Detecting Variable Intermittent Wipers w/Heated Jets
Galvanized Steel/Aluminum Panels
Lip Spoiler
Black Grille
Power Liftgate Rear Cargo Access
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Cornering Lights
Perimeter/Approach Lights
LED Brakelights
Headlights-Automatic Highbeams
Entertainment
Radio: AM/FM Audio System
Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation, Radio Data System and External Memory Control
18 Speakers
Streaming Audio
Window Grid Diversity Antenna
Bowers & Wilkins Surround Sound
Bluetooth Wireless Phone Connectivity
2 LCD Monitors In The Front
Interior
M Multi-Function Seats -inc: lumbar support
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
Power Tilt/Telescoping Steering Column
Sport Heated Leather Steering Wheel w/Auto Tilt-Away
Illuminated Front Cupholder
Rear Cupholder
Interior Lock Disable
Valet Function
Power Fuel Flap Locking Type
Remote Releases -Inc: Comfort Access Proximity Cargo Access
Garage Door Transmitter
Cruise Control w/Steering Wheel Controls
HVAC -inc: Underseat Ducts and Console Ducts
Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Aluminum Instrument Panel Insert, Aluminum Door Panel Insert, Piano Black Console Insert, Metal-Look Interior Accents and Merino Leather Upholstered Dashboard
Full Alcantara Simulated Suede Headliner
Merino Leather Door Trim Insert
Metal-Look Gear Shifter Material
Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination
Full Floor Console w/Covered Storage and 1 12V DC Power Outlet
Front And Rear Map Lights
Fade-To-Off Interior Lighting
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Carpet Floor Trim
Trunk/Hatch Auto-Latch
Cargo Area Concealed Storage
Cargo Features -inc: Tire Mobility Kit
Roll-Up Cargo Cover
Cargo Space Lights
Memory Settings -inc: Driver And Passenger Seats, Door Mirrors and Steering Wheel
Tracker System
ConnectedDrive Services
Connected Package Pro
Wireless Device Charging
Personal eSIM 5G
Driver / Passenger And Rear Door Bins
Delayed Accessory Power
Driver Information Center
Head-Up Display
Redundant Digital Speedometer
Outside Temp Gauge
BMW TeleServices
Power Adjustable Front Head Restraints and Manual Adjustable Rear Head Restraints
Front Center Armrest and Rear Center Armrest w/Storage
Perimeter Alarm
Immobilizer
1 12V DC Power Outlet
Air Filtration
Safety
Side Impact Beams
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Park Distance Control Front And Rear Parking Sensors
Active Blind Spot Detection Blind Spot
Front Collision Mitigation with Left Turn Warning
Collision Mitigation-Front
Evasion Assist
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st And 2nd Row Airbags
Airbag Occupancy Sensor
Rear Child Safety Locks
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point and Pretensioners
Similar Vehicles

2026 Nissan Kicks SR

Stock: NTL307454

Quick View

2026 Nissan Kicks SR

Stock: NTL311923

Quick View

2019 Nissan Altima 2.5 SL

Stock: TKC159415

Quick View

2023 Nissan Rogue SV

Stock: TPC814292

Quick View

Dealer FAQs

Can I get financed for an auto loan at Benton Nissan of Columbia?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at Benton Nissan of Columbia to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call 931-388-2023 or apply online now. 

What is the financing process like at Benton Nissan of Columbia?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at Benton Nissan of Columbia?

Great question. Securing a competitive loan from Benton Nissan of Columbia takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call 931-388-2023. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Columbia.

What is involved in securing an auto loan in Columbia TN?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Columbia come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at Benton Nissan of Columbia to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial 931-388-2023 when you have a few free moments and you'll soon see that getting approved for a car loan at Benton Nissan of Columbia is quick, easy, and convenient.

New vehicle pricing includes all offers and incentives. All vehicle prices are plus taxes, title, and DMV fees. Advertised price includes factory-installed options and dealer-installed accessories. While great effort is made to ensure the accuracy of the information on this site, errors do occur so please verify information with a customer service rep. This is easily done by calling us or visiting the dealership. 

It is the customer's responsibility to verify the stated equipment or warranty status - whether Certified Pre-Owned (CPO), Pre-Owned with inspection, or As-Is - on any pre owned vehicle listing prior to arrival or during the visit. 

**Some offers are with approved credit. Terms may vary. Must finance with NMAC at standard rate. Online pricing cannot be combined with any other offer. By providing your information, you agree to receive emails, text messages, and phone calls, which may be recorded and/or sent using automated dialing or emailing equipment or software, unless you opt-out from such communications. I understand that my consent to be contacted is not a requirement to purchase any product or service and that I can opt-out at any time. Standard messaging and data rates may apply, if applicable. 

***Here at Benton Nissan of Columbia, our goal is truly exceptional customer service. This goes through all aspects of the sales process for your new vehicle. We offer a Benton Benefits Package available on every qualified vehicle. Our Benton Benefits is our exclusive package that includes a No-Charge Lifetime Powertrain Warranty, Window Tint with Lifetime Warranty, Road Hazard Flat Repairs with Lifetime coverage (BNC DEALERS ONLY), 3 Synthetic Oil Changes & Tire Rotations, and NO Vehicle Diagnostic Fees. Ask your Sales Consultant for details.




© 2026 Benton Nissan of Columbia